Ground Freezing Resolves Complex Challenges Ahead of SEM Tunneling

April 12, 2017

Considered the most challenging aspect of the East Side Access megaproject, Northern Boulevard Crossing was successfully excavated by SEM methods beneath a protective canopy of frozen ground through complex soils below the groundwater table.