Dam Rehabilitation & Reconstruction
Deep well dewatering to lower groundwater below core foundation subgrade for dam replacement.
Download Lyman_Run_Dam_Galeton_PA_001.pdf
Installation of a permanent dewatering system to improve overall dam stability, a temporary system to facilitate new toe drain installation, and rock grouting to reduce the permeability of weathered rock.
Download Watres_Dam_Spring_Brook_PA_001.pdf
Sinkhole repair, installation of a conduit filter and toe drain system, and construction of wave protection as part of complete dam rehabilitation.
Download Swinging_Bridge_Dam_Forestburgh_NY.pdf
Installation of a deep well system, an eductor system, and tied back soldier pile and lagging support systems to facilitate construction of a new RCC structure at the toe of an existing dam.
Download BearCreek_Dam_Russellville_Alabama_002.pdf