Literature
Environmental Remediation
EPA-directed environmental remediation at the Bayway Refinery Domestic Trade Terminal included collection and removal of impacted groundwater. To achieve this, Moretrench installed a 600-foot long, permanent biopolymer collection trench and barrier curtain wall.
Installation of a 185-foot long slurry trench to provide interim relief to a 96-inch diameter storm drain that had ovalized and was close to failure due to the expansion of soils contaminated with COPR.
Design/Build installation of a gas and leachate collection system prior to closure and redevelopment of a former municipal solid waste landfill site. Scope of work included a gas extraction an permanent flare system and a perimeter hydraulic barrier collection trench.