Beams and Lagging

By October 24, 2014 No Comments
Beams and lagging is the most common method of temporary excavation support. Beams may be drilled in, driven, or in very difficult ground, installed as micropiles. The lagging is installed top-down as excavation proceeds. This is a free-draining system and dewatering must be provided when installation proceeds below the water table.